• Post-Replacement Procedure
1. Start the instrument.
Click here for "Starting the Instrument (TOC-1000e)"
2. Check the operation of the reactor.
Click here for "Starting the Instrument (TOC-1000e)"
2. Check the operation of the reactor.
[Maintenance] - [Mechanical Check] - [Standard Machine]

Press this button to switch the reactor operation(5). When the operation is ON, it is normal if the [Lamp] is ON(1).
3. Set the reactor operation time to 0.1) Display the [Counter] screen.
Refer. "Checking the Replacement Timing"
2) Press
3) Press [OK] on the confirmation screen.
The [Value] value is set to [0 Hours].
4) Press [Back].
You will be returned to the Home screen.
The [Value] value is set to [0 Hours].
4) Press [Back].
You will be returned to the Home screen.

4. To continue without replacing the pump head, perform rinsing, remove the bubbles, and then perform calibration.
1) Rinse the flow lines.
2) Check for bubbles.
Click here for "Rinsing the Flow Lines/Click here for Checking for Bubbles (TOC-1000e)".
3) Perform calibration
Click here for "Calibration (TOC-1000e)".
If you are replacing the pump, perform the procedure from step 4 in "Replacing the Pump Head".
Comments
0 comments
Please sign in to leave a comment.